Crude oil tanks disassembly and new piping installation
Client/Investor: PERN “Przyjaźń” S.A., PL
Contractor: OKZ HOLDING sp. z o.o., PL
Location: Crude Oil Storage Tank Farm Plebanka, Płock, PL
Subject: Disassembly of three crude oil tanks with auxiliary installations: process piping, water, foam and sewage systems, civil works. Installation of new crude oil piping.
Parameters: 3 x 12,000 m3, 309 t of DN800 pipes
Initiated: 07/2011
Completed: 11/2011
Продължение...
Erection of water tank for Dolna Odra Power Plant
Client/Investor: RAFAKO S.A., PL
Contractor: OKZ HOLDING sp. z o.o., PL
Location: Dolna Odra Power Plant, Gryfino, Poland
Subject: Prefabrication and erection of water tank, emergency drainage
Storage capacity: 1 x 1,490 m3
Initiated: 01/2010
Completed: 08/2011
Продължение...
Строителство на резервоар за деминерализирана вода
Възложител/Инвеститор: Grupa LOTOS s.a., Fluor s.a., Полша
Предприемач: ОКЗ ХОЛДИНГ-ООД, Полша
Местоположение: Рафинерия LOTOS, Гданск, Полша
Предмет: Доставка и монтаж на резервоар за деминерализирана вода
Общ обем: 1 x 5,000 м3
Начало на проекта: 10/2008
Край на проекта: 06/2009
Продължение...
Изграждане на резервоари в Гданск, Полша
Възложител/Инвеститор: PETRO EnergoRem sp. z o.o., Полша/Grupa LOTOS s.a., Fluor s.a., Полша
Предприемач: ОКЗ ХОЛДИНГ-ООД, Полша
Местоположение: Гданск, Полша
Предмет: Изграждане на резервоари за суров петрол вкл. тръбопроводи, оборудване и инфраструктура
Общ обем: 2 x 20,000 м3
Начало на проекта: 08/2008
Край на проекта: 03/2009
Продължение...